- Hyperscalers collectively budgeted ~$600B in 2026 capex, with NVIDIA capturing the majority of AI accelerator spend as customers deploy Blackwell and upcoming Vera Rubin architectures.
- NVIDIA Q2 FY2026 data center revenue reached $41.1B, up 56% year-over-year, driven by demand for GPU clusters supporting training and inference workloads.
- Partnerships include 10 GW OpenAI deployment announced 2025, Europe's largest AI campus in France at 1.4 GW, and sovereign AI projects in Saudi Arabia targeting 500 MW.
Commitments
- SBTi-validated target: 50% absolute Scope 1 and 2 reduction by FY2030 from FY2023 baseline, disclosed June 2025.
- Achieved 100% renewable electricity for offices and data centers under operational control by end of FY2025, reducing market-based Scope 2 to zero.
- 75% Scope 3 intensity reduction per PetaFLOP by FY2030; no absolute Scope 3 target or net-zero date announced as of March 2026.
Energy Strategy
A venture-capital approach to energy infrastructure, concentrated in 2025–2026 on equity stakes in grid-flexible AI factory developers, nuclear baseload, and battery supply-chain plays rather than traditional renewable PPAs.
- NVentures led three equity rounds totaling ~$1.35B into Firmus Technologies (2025–2026), backing 1.6 GW of AI factories in Tasmania and mainland Australia powered by renewable grids.
- Invested in TerraPower's $650M round (June 2025) for the Natrium SMR plant in Wyoming, marking first direct nuclear investment to secure baseload power for AI data centers.
- Backed Commonwealth Fusion Systems' $863M round (August 2025) targeting 50–100 MW net fusion power with SPARC prototype, and Emerald AI's flexible-load software deployed at NVIDIA's 96 MW Aurora facility in Virginia.
- Portfolio reflects a systems-level bet: securing gigawatt-scale power access and grid flexibility to unlock data center interconnection bottlenecks, not incremental renewable procurement.
Investment Timeline
Deal Breakdown
By Category
By Energy Type
Geographic Footprint
Loading map...
All Deals
| Date | Deal | Capacity | Value | Category | |
|---|---|---|---|---|---|
| Apr 2026 | NVIDIA (NVentures) – Firmus Technologies $505M Equity Round (Round 3 / Pre-IPO) Firmus Technologies Pty Ltd | 1.6 GW | — | Equity | |
| Mar 2026 | NVIDIA (NVentures) – Emerald AI Strategic Expansion Round Emerald AI | — | — | Equity | |
| Mar 2026 | NVIDIA + Emerald AI – Flexible AI Factory Partnership (AES, Constellation, Invenergy, NextEra, Nscale, Vistra) Emerald AI; AES Corporation; Constellation Energy; Invenergy; NextEra Energy; Nscale Energy & Power; Vistra | — | — | JV/Partnership | |
| Nov 2025 | NVIDIA (NVentures) – Firmus Technologies A$500M Equity Raise (Round 2) Firmus Technologies Pty Ltd | 1.6 GW | — | Equity | |
| Oct 2025 | NVIDIA (NVentures) – Redwood Materials Series E Redwood Materials, Inc. | — | — | Equity | |
| Sep 2025 | NVIDIA (NVentures) – Firmus Technologies A$330M Equity Placement (Round 1) Firmus Technologies Pty Ltd | 150 MW | — | Equity | |
| Aug 2025 | NVIDIA (NVentures) – Commonwealth Fusion Systems $863M Round Commonwealth Fusion Systems | — | — | Equity | |
| Jun 2025 | NVIDIA (NVentures) – TerraPower $650M Capital Raise TerraPower, LLC | — | — | Equity | |
| Apr 2025 | NVIDIA – Utilidata Series C (Grid-Edge AI Platform Scale-Up) Utilidata | — | — | Equity | |
| Oct 2024 | NVIDIA – Southern California Edison Intelligent Grid Collaboration Southern California Edison | — | — | JV/Partnership | |
| Feb 2022 | NVIDIA – Utilidata Series B (Grid-Edge AI Platform) Utilidata | — | — | Equity | |
| Jan 2021 | NVIDIA – Utilidata Joint Development Partnership (Karman Smart Grid AI Chip) Utilidata | — | — | JV/Partnership | |
| Jan 2020 | NVIDIA On-Site Solar Generation (US and India Offices) Multiple contractors | 1 MW | — | Infra/Capex |